QUIZ 1. THE MOST RELIABLE ESTIMATE IS ? PLINTH AREA ESTIMATE DETAILED ESTIMATE PRELIMINARY ESTIMATE CUBE RATE ESTIMATE 2. THE UNIT OF MEASUREMENT FOR QUINTAL FOR ? COLLAPISIBLE GATE WITH RAILS ROLLING SHUTTERS EXPAND METAL WIRE NETTING REINFORCEMENT OF R.C.C WORKS 3. THE RATE OF ITEM OF WORK DEPEND ON ? SPECIFICATIONS OF WORKS SPECIFICATIONS OF MATERIALS PROPORTION OF MORTAR ALL THE ABOVE 4. THE ITEM OF STEEL WORK WHICH IS MEASURED IN SQ.M ? COLLAPSIBLE GATES ROLLING SHUTTERS VENTILATORS ALL THE ABOVE 5. THE BRICKWORK MEASURED IN SQ METRE IN CASE OF ? HONEY COMB BRICK WORK BRICK FLAT SOLING HALF BRICKWALLS ALL THE ABOVE 6. PICK UP THE ITEM OF WORK NOT INCLUDED IN THE PLINTH AREA ESTIMATE ? WALL THICKNESS ROOM AREA VERANDAH AREA COURTYARD AREA 7. THE MINIMUM WIDTH OF SEPTIC TANK IS TAKEN ? 75 CM 80 CM 70 CM 90 CM 8. BRICK WALL ARE MEASURED IN SQ.M IF THE THICKNESS OF THE WALL IS ? 10 CM 20 CM 25CM NONE OF THE ABOVE 9. WHILE PREPARING A DETAILED ESTIMATE DIMENSION SHOULD BE MEASURED CORRECT TO 0.01 M DIMENSION SHOULD BE MEASURED CORRECT TO 0.01 SQM DIMENSION SHOULD BE MEASURED CORRECT TO 0.01 CUM ALL THE ABOVE 10. IN LONG AND SHORT WALL METHOD OF ESTIMATION,THE LENGTH OF LONG WALL IS THE CENTRE TO CENTRE DISTANCE BETWEEN THE WALLS AND BREADTH OF THE WALL HALF BREADTH OF WALL ON EACH SIDE ONE FOURTH BREADTH OF THE WALL ON EACH SIDE NONE OF THESE NAME : (required) YEAR OF PASSING :(required) 2018 2019 2020 2021 UNIVERSITY/COLLEGE :(required) CONTACT NUMBER :(required) Submit Δ Share this:TwitterFacebookLike this:Like Loading...